Front Parking Partner

This off-street parking design holds two vehicles with extra room for a lawn—great for sharing with a neighbor who also needs parking.

SunPart Shade

Cost

$5,500+

Upkeep

Medium

Experience

Advanced

Stormwater

Better

Sun/Shade

Sun, Part Shade

The Field Guide has two designs that can transform your lot into an amenity for responsible residential parking. This one, the Front Parking Partner, is a good option for those looking to gain as much parking as possible. It provides parking for two vehicles, but, because it uses a curb cut, which requires extensive permitting and coordination with the city, it is more expensive than the second design, the Rear Parking Partner. Both designs occupy less than half of the lot. The Rear Parking Partner design has the added benefit of making vehicles less visible from the street. It is accessible from the alley and aligns with the adjacent garages. This design makes for a better appearance from the street, and also protects vehicles from trouble. The paved parking pad in both designs allows water to infiltrate the ground, instead of running quickly off into the street and into Detroit's sewerage system.

The Front Parking Partner is a good option for those looking to gain space for off-street parking. This lot design provides parking for two vehicles, and requires a curb cut. This lot is a great design to share with a neighbor who also needs parking!

Ideal Location: Residential lot in full sun to part sun (near one or two residential houses is ideal).

Cost

This is a high priced lot design. The price is based on materials only and the cost of hiring a contractor to permit and build the curb cut.

Green Infrastructure

The paved parking pad in this design allows water to infiltrate the ground, instead of running quickly off into the street and into Detroit's sewerage system. The gravel sub-base and geotextile fabric work together to absorb and contain automotive related runoff, rather than it draining directly into the soil.

Vegetation and Visibility

This lot design creates a degree of privacy for the back of the lot, however, clear views are maintained from the street through to the front half of this design.

Falling Hazard

If you follow the design specifications, the tree and shrubs are located to ensure that basement root intrusion and potential falling hazards do not occur, and that the City’s plan review requirements are followed. Unmaintained trees create a hazard to neighboring structures, as well as to cars. We recommend working with a certified arborist as your trees mature. Please note the trees on the plan are shown at a mature spread.

Build

The Field Guide recommends hiring a professional to build this project, or at least to assist you with the first few steps of the design—the parking pad is truly a lot of digging and the curb cut requires permitting and professional oversight. If you would like to install the plants yourself, or if you are indeed up for lots of digging, please follow the step-by-step directions provided. If you decide to build this yourself, the Field Guide recommends enlisting the help of physically active family members, friends, and neighbors, as well as renting machinery to help you with your excavation, as the digging is the most physically demanding aspect of the lot design. Plan for at least two weekends of work for the volunteer part of this design, with an extra weekend for gathering your supplies.

Build Time Estimate

Ten hands or more! With the help of friends, family or neighbors, and with an experienced leader, this project could be completed in two weekends, not including your permitting process. The Field Guide assumes the lot is ‘construction ready,’ and all equipment and materials required for the lot design have been acquired and are ready to use. Note: This is a lot design that can be built in phases—for example, the parking pad during the summer, and then your plants once it begins to cool down.

Build Difficulty

Number of People Needed

Neighbor Labor

Time Taken to Build

Build Season

Transportation Intensity

Permit Requirements

Upkeep

This lot design requires a medium level of maintenance to thrive. Maintenance will include watering plants and newly planted trees, particularly during times of drought and excess heat, trimming trees and shrubs, and general upkeep of the parking area.

Seasonal Upkeep Levels

  • Spring: Low
  • Summer: Low
  • Fall: Low
  • Winter: Low

Upkeep Frequency

Professional Assistance

Special Tools